Kresge Art Center
Kresge Art Center
–
Asbestos abatement
Abatement of asbestos-containing materials throughout the entire building. During this project approximately 37,000 square feet of ceiling, 4,200 square feet of floor tile, and 800 linear feet of piping will be removed.
To accommodate renovations in the building.
The requester of this project is responsible for the removal of any furniture or other items which may inhibit the ability of the contractor to perform this abatement. Asbestos work areas are strictly off limits to persons who are not trained or directly involved with the project. Please respect all warning signs and danger tape.
Matt Smith, Planner/Inspector/Analyst, at (517) 898-5382 or smit2620@msu.edu or IPF at (517) 353-1760.