Veterinary Medical Center
Veterinary Medical Center
–
HVAC maintenance
What is being done?
Temporary shutdown of Supply Fans 10, 11, 12, 13, 14 and 16.
Why is this being done?
Vibration analysis testing.
How will this impact building occupants?
During this shutdown, fume hood exhaust will be affected. Please see fume hood special precaution notice below. Also, during this shutdown building ventilation will be affected. Building occupants may notice a change in building temperature.
Note: Please cover/contain all hazardous materials within the fume hoods and close all fume hood sashes during this shutdown
Who can I contact for more information?
Rich Lilly, skilled trades supervisor, at (517) 432-0510 or lillyri@msu.edu, or IPF at (517) 353-1760.