IPF maintenance and construction notices

Active Notices

Dairy Cattle Teaching and Research

Dairy Cattle Teaching and Research ·
Construction of a new Dairy Teaching and Research facility, which will build on MSU’s strength as a globally recognized leader in animal and veterinary science and agricultural engineering.

Akers Hall

Akers Hall – West ·
Phase 1 of this project involves renovations and ADA modifications to West Akers Hall Rooms 289, 290, 389, 390, 489, 490, 589, 590, 689, 690. The rooms are located on either side of the elevator on floors 2-6.

Campus-wide fire hydrant flushing may cause red water

Campus wide ·
Fire hydrant flushing may result in water discoloration. Fire hydrants are flushed annually to inspect, provide reliability, clean and scour the piping to our water system.

Shaw Hall

Shaw Hall ·
A new automatic building steam valve is being installed.

Clinical Center Entrance

Clinical Center Entrance/Exit D ·
Removing HVAC equipment from the roof to create space for the new HVAC equipment for Clinical Center D-Wing.

Communication Arts Building

Communication Arts Building - 5th floor (May 28 - June 28), 4th floor (June 17 - July 19), 3rd floor (July 8 - August 9) ·
The HVAC controls in the rooms are being upgraded to digital controls due to obsolete parts.

Parking Lot 38, Erickson Drive Loop, and adjacent sidewalks

area around Erickson Hall ·
Temporary closure of Parking Lot 38, a portion of the Erickson Drive Loop, and adjacent sidewalks for installation of new ductile iron water main as part of the Farm Lane Bridge/Road Reconstruction and Infrastructure Improvements project.

Campbell Hall

Campbell Hall ·
Construction commencement, loop closure and relocation of ADA parking spaces.

Wells Hall

Wells Hall ·
Alterations to rooms C514 and C517 to create renovated classroom space as well as a computer lounge/copy room.

Akers Hall

Akers Hall ·
Plumbing fixture replacement and piping to the riser in rooms as part of the construction project to renovate apartments.