Active Notices

Berkey Hall

Berkey Hall – First Floor and Lower-Level Infrastructure ·
The identified first-floor area (approximately 6,500 square feet) will be completely renovated to provide a new commons area and program space for the College of Social Science.

Berkey Hall

Berkey Hall, Rooms 12C, 210B, 214, 218A, and 218B ·
Abatement of of approximately ACM (Asbestos Containing Material).

Parking Lot 38 (Erickson Hall)

Parking Lot 38 (Erickson Hall) ·
Complete closure of Parking Lot 38 along with the drive lane in front of Erickson Hall to accommodate parking lot renovations.

Parking Ramps 1,2,3,5,6,7

Parking Ramp 1 (Shaw Lane), Parking Ramp 2 (Administration), Parking Ramp 3 (Wharton), Parking Ramp 5 (Communications), Parking Ramp 6 (Grand River Ave), and Parking Ramp 7 (Harison Rd) ·
Temporary closure of various parking spaces, stairwells and driving lanes for annual maintenance items, traffic coating, and various structural repairs.

Anthony Hall

Anthony Hall ·
Replacement of elevators #1, #2, #3 and #5 which have reached the end of their useful lives. Elevators will be replaced one at a time, starting with elevator #1.

Parking Lot 61

Parking Lot 61 (Spartan Stadium) and Chestnut Rd ·
Temporary intermittent lane closures on northbound Chestnut Road (between Lot 61 and Dem Hall Rd).

Anthony Hall

Anthony Hall ·
Insulation of the 3rd floor roof in B and C wings to help with energy efficiencies in the building.

Multiple Campus Buildings

Multiple campus buildings - see list below ·
Testing of life-safety fire alarm systems. During the first hour of each test, technicians will test the speakers and strobes to ensure functionality.

Campus-wide Monthly Generator Testing - May 2024

Campus-wide, see building list and schedule in link below ·
Testing of the life-safety generators, as a monthly requirement of the National Fire Protection Agency.

Plant Science Greenhouse - West

Plant Science Greenhouse - West ·
Renovations and additions to existing greenhouses to provide robust, secure and energy-efficient greenhouse facilities with the capacity for computer climate and lighting control, and real-time monitoring of growth conditions.