Alerts

Active Alerts

Chemistry Building

Chemistry Building ·
Infrastructure Planning and Facilities staff will perform a visual walkthrough of the building documenting mechanical, structural and electrical facility assets and barcoding the assets.

Hubbard Hall

Hubbard Hall ·
Infrastructure Planning and Facilities Maintenance staff will be cleaning and inspecting the condition of the roofs.

Akers Hall

Akers Hall ·
Infrastructure Planning and Facilities Maintenance staff will be cleaning and inspecting the condition of the roofs.

Shaw Hall

Roofing Inspection ·
Infrastructure Planning and Facilities Maintenance staff will be cleaning and inspecting the condition of the roofs.

Holmes Hall

Holmes Hall ·
Infrastructure Planning and Facilities Maintenance staff will be cleaning and inspecting the condition of the roofs.

Clinical Center – Clinic

Clinical Center – Clinic ·
Shutdown of Elevator A

Infrastructure Planning and Facilities

Infrastructure Planning and Facilities ·
Abatement of asbestos-containing materials in room 141C. During this project approximately 440 square feet of flooring and 300 cubic feet of insulation will be removed.

Future Alerts

Water Treatment Plant

Water Treatment Plant ·
Testing of life-safety generator

1855 Place - Building 1801

1855 Place - Building 1801 ·
Testing of life-safety generator

Interdisciplinary Science & Technology Building

Interdisciplinary Science & Technology Building ·
Testing of life-safety generator

Munn Ice Arena

Munn Ice Arena ·
Shutdown of sanitary pump.

Michigan Biotech Institute

Michigan Biotech Institute ·
Testing of life-safety generator

Michigan Biotech Institute

Michigan Biotech Institute ·
Testing of life-safety generator

Owen Graduate Hall

Owen Graduate Hall ·
Infrastructure Planning and Facilities Maintenance staff will be cleaning and inspecting the condition of the roofs.

McDonel Hall

McDonel Hall ·
Infrastructure Planning and Facilities Maintenance staff will be cleaning and inspecting the condition of the roofs.

Fee Hall, locker rooms off loading dock.

Fee Hall, locker rooms off loading dock. ·
Abatement of asbestos-containing materials in the locker rooms off the loading dock. During this project approximately less than five linear feet of TSI will be removed.

Engineering Building

Engineering Building ·
Abatement of asbestos-containing materials in room 2205. During this project one chalkboard will be removed.