Clinical Center Section C - Sanitary Drainage Shutdown

Clinical Center Section C

–

Utility shutdown

What is being done?

Replacement of sanitary drainage as the existing drainage is beginning to leak.

How will this impact building occupants?

There will be no use of floor drains or sinks in hallway or Labs C213-C223.

Please notify all personnel in your department. Your cooperation during this time is appreciated. We apologize for the inconvenience.

Who can I contact for more information?

Shawn Smith, Planner/Inspector/Analyst, at (517) 927-7494 or smith9811@msu.edu, or ContactIPF at (517) 353-1760.