1855 - Building 1801 - HVAC Shutdown

1855 - Building 1801 Office and Retail

–

HVAC maintenance

What is being done?

Shutdown of rooftop unit A1B to replace failed bearings. 

How will this impact building occupants?

There will be low static and possible temperature swings during this time. 

Please notify all personnel in your department. Your cooperation during this time is appreciated. We apologize for the inconvenience.

Who can I contact for more information?

Kyle Steinacker, Skilled Trades Supervisor, at (517) 242-5291 or steinac7@msu.edu, or ContactIPF at (517) 353-1760.