Breslin Student Events Center

Breslin Student Events Center

Construction notice

What is being done?

Improvements are being made to the ventilation systems in the loading dock area (south side of facility).

How will this impact building occupants?

There will be:

  • intermittent construction noise in the loading dock and ramp areas;
  • short duration shutdowns of the HVAC systems in the loading dock area only;
  • and shutdowns of portions of the ramp for equipment clearances.

What do I need to do?

  • Please obey all construction area barriers and keep a safe distance from construction equipment.
  • Please notify all personnel in your department.
  • Your cooperation during this time is appreciated.
Who can I contact for more information?

Ryan Winkler, project manager, at (517) 281-9354 or winkle53@msu.edu, or IPF at (517) 353-1760.