Chemistry Building - DI water shutdown

Chemistry Building

Utility shutdown

What is being done?

Temporary shutdown of Deionized Water (DI) to replace failing cold water piping to the system.

How will this impact building occupants?

During this time production of DI water will be halted.

Who can I contact for more information?

Alan Vanderstelt, Mechanical Designer, at 517-643-6763 or vande832@msu.edu, or IPF at 517-353-1760.

Project Number/CP: CP21091