Communication Arts and Sciences
Communication Arts and Sciences
–
HVAC maintenance
What is being done?
Temporary shutdown of HVAC-1
Why is this being done?
To replace the failing motor on HVAC-1 supply fan.
How will this impact building occupants?
During this shutdown, temperatures and ventilation will be affected to the WEST side of the third through fifth floors, which includes following rooms:
- Third Floor: 343 through 387
- Fourth Floor: 442 through 482
- Fifth Floor: 541 through 579
Who can I contact for more information?
Brian Powe, skilled trades supervisor, at (517) 899-7197 or powebria@msu.edu, or IPF at (517) 353-1760.