Temporary shutdown of electrical service to Conrad Hall
Due to electrical work being performed on primary circuit H18, Conrad Hall will experience a brief power outage until the building can be powered up by an emergency generator. The reason for the outage is because Conrad Hall is a single ended substation with only one primary circuit feeding this building.
The outage will be scheduled for 30 minutes on Wednesday, May 29 and will remain on generator until Saturday, June 1. The building will experience a second outage when it is switched back to normal power and off the generator from 7-7:30 a.m. on Saturday, June 1.
Sensitive electronic equipment should be powered off during these switch overs.