Steam shutdown
What is being done?
Temporary shutdown of steam service to forced air ceiling heating units on the east side of the third floor to install new heating coils as part of energy efficiency updates and the alterations to the west side of the third floor project valves in the system.
How will this impact building occupants?
Building heat may be affected during this shutdown on the third (3rd) floor. The overhead forced air heat on the third floor will be temporarily shut down during this shutdown. The perimeter wall finn tube heating will not be affected and will still be providing heat during the shutdown.
Who can I contact for more information?
Tonino Pacifico, project manager, at 517-243-0260 or pacifico@msu.edu, or IPF at 517-353-1760.