Minskoff Pavilion - Heating Hot Water Shutdown

Minskoff Pavilion

–

Utility shutdown

What is being done?

Shutdown of the heating hot water system. A failed mainline valve in the hot water heating system is being replaced for system reliability. 

How will this impact building occupants?

Temperatures may be cooler than normal. 

Please notify all personnel in your department. Your cooperation during this time is appreciated. We apologize for the inconvenience.

Who can I contact for more information?

Sam Fortino, Skilled Trades Supervisor, at (517) 432-0505 or fortin17@msu.edu, or ContactIPF at (517) 353-1760.