Utility work
On Thursday, Dec. 1 from 5-7 a.m., the X panel, Fire Pump and Pent House (HVAC) will be shutdown. On Friday, Dec. 2 from 5-7 a.m., all distribution panels will be shut down. New electrical service is being installed for N. Kedzie.
During the electrical shutdown on Friday all receptacle circuits will be interrupted for approximately 15-20 minutes while each electrical panel is connected to the temporary panel. On Thursday, building occupants will only notice various lighting interruption and an interruption to the HVAC system.
Precautions Advised: It is recommended that facility occupants power down computers and sensitive laboratory equipment. We apologize for the inconvenience.
Dan Bell, skilled trades supervisor at (269) 209-6554 or belldani@msu.edu, or Contact IPF at (517) 353-1760.