Road and Sidewalk Closures
Shaw Lane, Trowbridge Road, Wilson Road, Stadium Drive
–
Sidewalk closure
Vehicle and bike lane closures on Trowbridge Road, Stadium Road, temporary reroute of traffic in Lot 59, as well as the closure of various sidewalks for the installation of chilled water lines and electrical infrastructure.
See maps for impacted areas and timeframes.
February 18 through March 1
Stadium Road closed between Chestnut Road and Wilson Road. Work happening between Trowbridge and Lot 59, Stadium between Landscape Services and MSU Police, and the sidewalk near the tennis courts between Wilson Road and Shaw Lane. Sidewalk near tennis courts will detour down Wilson Road to Red Cedar and then back on Shaw Lane. Pedestrian traffic on Red Cedar Road between MSU Police and Wilson Road will need to pass near the Communication Arts and Sciences building. Pedestrian traffic on Stadium will need to detour down Chestnut out to Wilson.
March 2 through March 9
Eastbound Trowbridge Road closed between Chestnut Road and Red Cedar Road. Work happening between Trowbridge and Shaw Lane following Stadium and the sidewalk near the tennis courts between Wilson Road and Shaw Lane. Walkway traffic will be permitted on the path that crosses between the tennis courts and Red Cedar Road. Pedestrian traffic on Red Cedar Road between MSU Police and Wilson Road will need to pass near the Communication Arts and Sciences building. Pedestrian traffic on the north side of Wilson will be detoured to the south side of the road and pedestrians on Stadium will need to detour down Chestnut out to Wilson.
March 10 through March 15
Trowbridge Road open. Work happening between Trowbridge and Wilson Road following Stadium Drive and the sidewalk near the tennis courts between Wilson Road and Shaw Lane. Walkway traffic will be permitted on the path that crosses between the tennis courts and Red Cedar Road. Pedestrian traffic on Red Cedar Road between MSU Police and Wilson Road will need to pass near the Communication Arts and Sciences building. Pedestrian traffic on the north side of Wilson will be detoured to the south side of the road and pedestrians on Stadium will need to detour down Chestnut out to Wilson.
March 16 through May 4
Trowbridge Road open. Stadium Road open between Landscape Services and MSU Police, including sidewalk between Stadium and Red Cedar. Work happening between Trowbridge and Wilson Road following Stadium Drive and the sidewalk near the tennis courts between Wilson Road and Shaw Lane. Walkway traffic will be permitted on the path that crosses between the tennis courts and Red Cedar Road. Pedestrian traffic on Red Cedar Road between MSU Police and Wilson Road will need to pass near the Communication Arts and Sciences building. Pedestrian traffic on the north side of Wilson will be detoured to the south side of the road and pedestrians on Stadium will need to detour down Chestnut out to Wilson.
During this work, roads, and/or specific traffic lanes, as well as certain drives and sidewalks, will be temporarily closed and traffic will be detoured. Please obey all flagmen, construction barriers, and signage and follow any posted detour signs.
Andy Linebaugh, project manager, at 517-243-0029 or linebau6@msu.edu, or IPF at 517-353-1760.
CP23037