Trowbridge Road temporary road closure
Trowbridge Road
–
Road closure
Temporary road closure of Trowbridge Road between Red Cedar Road and Chestnut Road. Contractors will be removing temporary concrete paving and installing permanent concrete curb/gutter and permanent asphalt paving.
This work is being done to finish the surface level road work on top of the infrastructure lines that were installed last year connecting the west regional chilled water plant and power plant.
Whenever possible, road closures are scheduled for the summer semester when campus traffic is at reduced capacity and impacts to campus occupants can be minimized.
Detours routes are encouraged on Chestnut Road, Wilson Road, and Red Cedar Road.
Walkways will remain open.
Please obey all construction barriers, mind all flagmen and patrol officers, and follow posted detours. Your cooperation and patience during this time is appreciated.
View map showing location on campus and detours as listed above.

Andy Linebaugh, project manager, at 517-243-0049 or linebau6@msu.edu or Contact IPF at 517-353-1760.
project number: CP23119