Veterinary Medical Center - HVAC Shutdown
Veterinary Medical Center
–
HVAC maintenance
What is being done?
Installing zone damper in room G200A as part of an energy conservation project.
How will this impact building occupants?
HVAC-15 which serves the space will be running a lower supply and exhaust volumes. Temperatures may fluctuate slightly during this time.
Affected Areas: G200, G200A, G200B, G200D, G200E, G203A, G205, G205A.
Special Precautions: Please cover/contain all hazardous materials within the fume hoods and close all fume hood sashes during this shutdown.
Please notify all personnel in your department. Your cooperation during this time is appreciated. We apologize for the inconvenience.
Who can I contact for more information?
Alan Heaviland, Planner/Inspector/Analyst, at (517) 512-4968 or heavila5@msu.edu, or ContactIPF at (517) 353-1760.