Breslin Student Events Center

Breslin Student Events Center

HVAC maintenance

What is being done?

Shutdown and drainage of the hot water heat system to the building ventilation system.

Why is this being done?

To perform a tie-in for additional heating.

How will this impact building occupants?

During this shutdown, there will be no ventilation hot water heat available to building occupants. Perimeter heat will still be available. Building occupants may experience cooler than normal temperatures.

Who can I contact for more information?

Sam Fortino, skilled trades supervisor, at (517) 432-0505 or fortin17@msu.edu, or IPF at (517) 353-1760.