HVAC maintenance
What is being done?
Temporary shutdown of HVAC 9
Why is this being done?
To install air flow stations and variable frequency drives to improve efficiency and reduce energy consumption of the HVAC 9 system.
How will this impact building occupants?
During this time, there will be no ventilation or air conditioning to the following rooms:
- First floor: 148-167
- Second floor: 236-247, 258, and 260
Who can I contact for more information?
Ryan Gallagher, Planner/Inspector/Analyst, at (517) 930-6922 or galla150@msu.edu, or IPF at (517) 353-1760.