Farrall Agricultural Engineering Hall

Farrall Agricultural Engineering Hall

HVAC maintenance

What is being done?

Temporary shutdown of HV-2.

Why is this being done?

To replace the bad heating and ventilation motor.

How will this impact building occupants?

During this shutdown, temperature and ventilation will be affected to the north end of the first and second floors, which includes the following rooms:

  • First floor – 100, 100A, 101, 102, 103, 104, 123 and 135
  • Second floor – 213, 214, 215, 216, 217, 218, 219, 220, 221, 222, 223, 224, 225, 226 and 227
Who can I contact for more information?

Brian Powe, skilled trades supervisor, at (517) 899-7197 or powebria@msu.edu, or IPF at (517) 353-1760.