Farrall Agricultural Engineering Hall

Farrall Agricultural Engineering Hall

What is being done?

Several sub panels will be shut down to connect a new HVAC unit.

Why is this being done?

An air conditioning unit is being added to Room 208, and to safely make the electrical connection, several electrical panels need to be shut off.

How will this impact building occupants?

There will be intermittent shutdowns during this time. Occupants' lights and outlets may be shut down depending on what circuits are switched off.

Please make sure all sensitive equipment (computers, etc.) are powered off prior to the commencement of work.

Who can I contact for more information?

Ian O’Brien, project manager, at (517) 353-7233 or iobrien@msu.edu or IPF at (517) 353-1760.