Kedzie Hall - South
Kedzie Hall - South
–
What is being done?
Temporary shutdown of electrical power to Panel LP-X and LP-XX.
Why is this being done?
To program and test the Automatic Transfer Switch that feeds LP-X and LP-XX panels.
How will this impact building occupants?
The outage will affect 120/208 volt power on Panels LP-X and LP-XX, and will affect fire alarms, egress lighting, security access, and network switches.
Who can I contact for more information?
Michael Ramirez, Planner/Inspector/Analyst, at (517) 881-3386 ramire15@msu.edu, or IPF at (517) 353-1760.