Music Practice
Music Practice
–
HVAC maintenance
What is being done?
Shutdown of perimeter hot water heating system
Why is this being done?
To facilitate summer renovation work within the building related to the Music Building Addition
How will this impact building occupants?
In the event of colder than average weather throughout this period, rooms around the building perimeter on floors 1-5 could be cooler than desired.
Who can I contact for more information?
Todd Wilson, project manager, at (517) 930-7365 or wilsont@msu.edu, or IPF at (517) 353-1760.