Roofing maintenance - Auditorium
Auditorium
–
Roofing maintenance
What is being done?
Installation of a new roof on the east end of the building.
Why is this being done?
To ensure the water-tight integrity of the building.
How will this impact building occupants?
There will be minimal noise during tear-off and application, most of which when use of power hoist is necessary.
Who can I contact for more information?
Wayne Buck, skilled trades supervisor, at (517) 432-0511 or wbuck@ipf.msu.edu, or Bob Lusk at (517) 432-0575, or IPF at (517) 353-1760.