Utility shutdown - Center for Integrated Plant Systems

Center for Integrated Plant Systems

Utility shutdown

What is being done?

Temporary shutdown of building heat that serves the C.I.P.S. greenhouses. 

Why is this being done?

To install a new heating system. 

How will this impact building occupants?

IPF plans to re-energize the heating system sometime mid-summer, before cooler weather in the fall. 

Who can I contact for more information?

Scott Kyes, planner/inspector/analyst, at (517) 898-5153 or skyes@ipf.msu.edu, or IPF at (517) 353-1760.