Utility shutdown - Center for Integrated Plant Systems
Center for Integrated Plant Systems
–
Utility shutdown
What is being done?
Temporary shutdown of building heat that serves the C.I.P.S. greenhouses.
Why is this being done?
To install a new heating system.
How will this impact building occupants?
IPF plans to re-energize the heating system sometime mid-summer, before cooler weather in the fall.
Who can I contact for more information?
Scott Kyes, planner/inspector/analyst, at (517) 898-5153 or skyes@ipf.msu.edu, or IPF at (517) 353-1760.