1855 Place (Buildings 1808 and 1810)
1855 Place (Buildings 1808 and 1810)
–
Crane lift
What is being done?
Crane will be used to lift roof-mounted HVAC units.
Why is this being done?
To install a vibration isolation curb under the two HVAC units.
How will this impact building occupants?
Four apartments on each floor of the buildings and the corridors in the affected areas must be vacated during this time period. This is being arranged separately by Residential and Hospitality Services.
The following apartments must be vacated during crane lift hours: 145, 155, 160, 170, 245, 255, 260, 270, 345, 355, 360, 370, 445, 455, 460 and 470.
Who can I contact for more information?
Michael Bingham, Planner/Inspector/Analyst at (517) 930-8076 or bingha30@msu.edu, or IPF at (517) 353-1760.