Construction notice
Commencement of work on the project: Berkey Hall – First Floor Renovations – Phase 1. The scope of the project will include painting of walls and ceiling, refinishing of door frames, new lighting, and a new fire alarm system in the south corridor.
There will be intermittent construction noise in the vicinity of the affected spaces along with contractor traffic throughout the first floor. The southeast wing on the first floor will be inaccessible at times. Please obey all construction signage during the project.
Your cooperation during this time is appreciated. We apologize for the inconvenience.
Dan Launstein, project manager, at 517-896-2989 or launste2@msu.edu, or IPF at 517-353-1760.