Clinical Center
Clinical Center
–
Utility work
IPF HIgh Voltage Crew needs to flip normal sources of power for the XDP#5 ATS to remove the last PCB transformer installed in the electrical vault, and replace with a new transformer.
Building occupants will notice a brief outage when the breaker is opened and then re-fed with a different source.
Anything fed from Emergency ATS- XDP#5. Main distribution panels XDP-5A and XDP5B. Within these 2 MDP panels the following loads are affected:
- Panel K-2 Room A129
- UPS #1 South Wall Room A129
- UPS #2 North Wall Room A129
- EP-XAA1
- Isolation panel #3- room A206J
- Isolation panel #4- room A206J
- Isolation panel #5- room unknown
- Isolation panel #unknown- room A206I
- Room A206I
- Isolation panel #7- Room A205
- Isolation panel #8- RoomA206G
- Isolation panel #9- Room A205H
- Isolation panel #10- Room A205H
- Isolation panel #12- Room A205D
- Isolation panel #13- Room unknown
- Room A205F
Special Precautions: The breaker’s that feed power to the vaccine refrigerator will be affected by this outage. Please check to make sure they are good once power returns.
Dan Bell, skilled trades supervisor, at (517) 209-6554 or belldani@msu.edu, or IPF at (517) 353-1760.