Engineering Building
Engineering Building
–
Utility shutdown
Shutdown of Supply Fan 6 in order to replace fan bearings that have reached the end of their service life.
HVAC supply air will be reduced during this time. Building occupants may notice fluctuations in air temperature or pressure.
Affected Areas:
First Floor: 1103, 1105, 1107, 1108, 1108A, 1108B, 1108C, 1108D, 1108E, 1109, 1111, 1112, 1114, 1115, 1118, 1120, 1124, 1126, 1128, 1129, 1130, 1133, 1135, 1138, 1140, 1145, 1148
Second Floor: 2100, 2100A, 2100B, 2100C, 2100D, 2105, 2108, 2112, 2114, 2116, 2117, 2118, 2120, 2120A, 2120B, 2120C, 2120D, 2120E, 2121, 2122, 2125, 2125A, 2125B, 2125C, 2150, 2150A, 2152, 2128, 2129, 2132, 2134, 2138, 2140, 2142, 2144, 2148, 2153
Third Floor: 3100, 3105, 3105A, 3105B, 3110, 3110A, 3110B, 3112, 3114, 3115, 3115A, 3115B, 3115C, 3115D, 3115E, 3116, 3118, 3120, 3124, 3126, 3128, 3130, 3132, 3134, 3136, 3137, 3140, 3140A, 3142, 3143, 3144, 3145, 3147, 3149, 3150, 3153, 3155
Fourth Floor: 4110, 4110A, 4118, 4122, 4124, 4128, 4129, 4133, 4135, 4137, 4138, 4138A, 4138B, 4140, 4142, 3143, 4145, 4145A, 4147, 4150, 4155, 4160
Mike Ouderkirk, Skilled Trades Supervisor, at (517) 899-9279 or ouderki1@msu.edu, or ContactIPF at (517) 353-1760.