Giltner Hall
Giltner Hall
–
Crane lift
What is being done?
The compressor for AC-1 failed and must be replaced. A crane will be used to remove and replace the compressor for air conditioning unit AC-1 from the roof.
How will this impact building occupants?
During the crane lift, the following rooms will be closed: Rooms 117, 120, 132F, 132G 133 134 1HW1, 237, 237B, 237C 238, 238A & 238B. Highlighted areas on the attached graphics, including the highlighted area of parking lot 9, will not be available and will be closed during this time.
Who can I contact for more information?
Brian North, Planner/Inspector/Analyst, at (517) 898-5312 or northb@msu.edu, or IPF at (517) 353-1760.