Hannah Administration - All Floors
Hannah Administration - All Floors
–
Fire alarm testing
Testing of life-safety fire alarm system. During this time from 7 a.m. to 11 a.m., technicians will test the speakers and strobes to ensure functionality. Technicians will then bypass the speakers and strobes in the facility to test all initiation devices on the fire alarm system silently.
This is to test the integration of the new fire alarm work as part of the recent first floor alterations with the existing fire alarm systems on the second, third, and fourth floor.
IPF will come through the building and test all the fire alarm devices throughout the facility. Please be aware they may need to access offices and closets during these inspections. Building evacuation will not be required.
Tonino Pacifico, project manager, at 517-243-0260 or pacifico@msu.edu, or IPF at 517-353-1760.
Project Number: CP23093