Olds Hall
Olds Hall
–
Crane lift
Why is this being done?
A crane lift is being used for the replacement of an air conditioning system.
How will this impact building occupants?
The loading dock will not be accessible during this time.
Special Precautions: Rooms 110, 110A,110C,110D,110E,110F,110G should be unoccupied during the lift.
Who can I contact for more information?
Salem Mangles, Planner/Inspector/Analyst III, at (517) 643-3667 or mangless@msu.edu, or ContactIPF at (517) 353-1760.