Shaw Lane (South Side)
Shaw Lane (South Side)
–
Sidewalk closure
What is being done?
Minor excavation. Doing it to locate precise measurements on existing utilities to assist design of future construction of the Engineering and Digital Innovation Center.
How will this impact building occupants?
Pedestrian traffic will be routed around the work zones.
Who can I contact for more information?
Jeff Bonk, Project Manager, at (517) 230-6750 or bonk@msu.edu, or IPF at 517-353-1760.