Water system flushing

Why is this being done?

Temporary shutdown of domestic hot water service to all eight (8) floors of the west tower to replace several sections of existing galvanized plumbing lines that connect to the water softener system.

How will this impact building occupants?

During this shutdown, there will be no domestic hot water service to the entire facility. The cold water supply will still work at the sinks, lavatories, toilets, urinals, and showers. Bathrooms will still be operational but with no hot water at the sinks.

Who can I contact for more information?

Tonino Pacifico, project manager, at 517-243-0260 or pacifico@msu.edu, or IPF at 517-353-1760. 

 

Project Number: CP24028