IPF maintenance and construction notices
Receive Emailed Notices
If you want to have building notices regarding your building(s) emailed to you, subscribe via our online form.
Active Notices
Life Science, B Wing
Life Science, B Wing ·
–
Abatement of approximately 140 s.f. of ACM fireproofing and 40 linear ft of TSI to repair damage from water intrusion in Telecom closets and adjoining labs.
1855 Place – Building 1801, Angell Building, Anthony Hall, Auditorium, 1855 Place – Building 1801, Angell Building, Anthony Hall, Auditorium, Bailey Hall, Bioengineering, Biomedical Physical Sciences, Breslin Center, Broad Art Museum, ETC. See Details
1855 Place – Building 1801, Angell Building, Anthony Hall, Auditorium, 1855 Place – Building 1801, Angell Building, Anthony Hall, Auditorium, Bailey Hall, Bioengineering, Biomedical Physical Sciences, Breslin Center, Broad Art Museum, Brody Hall, Business ·
–
Testing of the life-safety generators, as a monthly requirement of the National Fire Protection Agency.
Parking Ramp 2-Auditorium Rd
Parking Ramp 2-Auditorium Rd ·
–
Temporary closure of the southeast stairwell and a small number of parking spaces adjacent to the stairwell on each level for urgent masonry repairs.
Hannah Administration, ground floor and first floor.
Hannah Administration, ground floor and first floor. ·
–
HVAC 6 is being shut down to have sheet metal put in place that will allow for better airflow throughout the building.
McDonel, East Wing; 1st floor, 2nd floor, 3rd floor, 4th floor, 5th floor, 6th floor
McDonel, East Wing; 1st floor, 2nd floor, 3rd floor, 4th floor, 5th floor, 6th floor ·
–
Failure of HVAC 1B fan bearings and damaged fan shaft that need to be replaced.
Anthony Hall, Elevator #3 - SE corner of building
Anthony Hall, Elevator #3 - SE corner of building ·
–
Temporary shutdown of elevator #3 to replace the elevator cab.
Hannah Administration
Hannah Administration ·
–
To allow for better airflow throughout the building, HVAC 2 is being shut down to metal line the concrete shafts. Air is leaking throughout the concrete shafts and this will make the unit run more efficient.
Wharton Center
Wharton Center ·
–
IPF staff will perform a visual walkthrough of the building to document mechanical, structural, and electrical facility assets. IPF assets are being located, mapped, and photographed for the Asset Data Collection Initiative.